Peak run · Chinook salmon as of 1 October 2026
13.1 miles of run water on the Black River, from Lake Michigan up to the end of the mainstem. 4 species run it, on windows curated from MDNR guidance.
The Black River at South Haven is carried as a Lake Michigan corridor with no ceiling, and the reason is worth stating plainly: the 'Kellogg Avenue Dam' the river was deferred for could not be found in any inventory, and appears not to exist. The USACE NID lists no dam on the Black River mainstem in Van Buren or Allegan County, OSM has no dam at South Haven, and the nearest real structure, Bangor Dam (NID MI00384), sits on the South Branch rather than the water the fish run up. So the corridor runs 13.1 miles over 23 NHD reaches — pierheads to river mile 1.6, mouth to 2.3, then lower river to 13.1 — with one state boating access site, Black River, inside it.
The windows carry dates because the estimator models this river; the dates are its statewide set, not a Black River reading. Chinook run 15 Aug – 31 Oct, coho 1 Sep – 30 Nov, steelhead 1 Oct – 31 Dec peaking 15 Oct – 15 Dec, and lake-run browns latest, 20 Oct – 31 Jan, peaking 1 Nov – 15 Jan.
One page each, answered from the same records as this one.
Each window is calendar guidance curated from the state's own run-timing prose, not a regulation and not an observation. The stage beside it is this site's reading of that window against 1 October 2026. This river is one of the sixteen the staging estimator models, so the window is shown in the estimator's dated form. Those dates are one statewide set, the same on all sixteen rivers, and no more river-specific than the months they restate — what the estimator adds here is the daily staging read, not a sharper calendar.
No barrier inside the run. The corridor runs to the end of the mainstem, which is a claim from the National Inventory of Dams rather than a gap in the data — the NID lists no structure on this river.
The 'Kellogg Avenue Dam' this river was deferred for could not be found in any inventory, and the reason appears to be that it is not there: the USACE NID lists no dam on the Black River mainstem in Van Buren or Allegan County, OSM has no dam at South Haven, and the only Kellogg Dam a search surfaces is on Kellogg Creek in Milwaukie, Oregon. The nearest real structure is the Bangor Dam (NID MI00384) and it is on the South Branch, not the mainstem, so it is not a ceiling for the river the fish run up. Treated as a corridor with no ceiling rather than left deferred for a barrier that does not exist.
| Zone | What it is | River miles |
|---|---|---|
| Pier | the pierheads and the harbour mouth | 0.0–1.6 |
| Mouth | the river mouth | 1.6–2.3 |
| Lower | the lower river | 2.3–13.1 |
River miles from the harbour mouth, walked up the NHDPlus HR mainstem. Fish arrive at the bottom of this table and work up it as the river cools and rises.
State boating access sites inside the corridor's box, from the MDNR Boating Access Sites record. A ramp is not a wade-in — these are where a boat and a car go, and the bank between them is a question for the public land layer on the live map.
Open the Black River (South Haven) on the live map →
Great Lakes tributary rules are their own rules: seasons, gear and possession on run water differ from the inland trout regulations, and they differ by river and often by reach. Michigan's regulation summary is here, and the state's own guide is the regulation.
General guidance by species, not by river — there is no record of what a given river fishes best with, and a page that invented one would be worse than a page that says so.
The next corridors up and down this shore, nearest first.