BirdTrout Open the map

When does the run start on the Vermilion River, Ohio?

Open this river in the app
The run corridor The mouth Wakeman Low Head Dam — the run stops here
The colour is this river's run stage today, read off Ohio EPA run-timing guidance. Where along the corridor the fish are is not modelled here — only the sixteen rivers the staging estimator covers carry that. Drawn 30 September 2026, north up, and it is a map of the river rather than of the lake it runs from.

Staging · Steelhead as of 30 September 2026, 1 day out

Nothing is inside a window on the Vermilion River on 30 September 2026. The next run to open is steelhead, 1 October — 1 day from now — and it runs to 31 May 2027. Windows are calendar guidance curated from Ohio run-timing prose and are month-grained, so the edges are the month rather than the day.

23.6 corridor miles · Lake Erie · windows curated from Ohio guidance · page built 30 September 2026

Every run window on the Vermilion River, in date order

The window is Ohio's curated run-timing guidance placed on this year's calendar. The stage beside it is this site's reading of that window against 30 September 2026 and nothing more — it is arithmetic on a date, not an observation of the river.

SpeciesWindowPeakToday
Steelhead 1 October – 31 May 2027 Oct–May · calendar not stated Not yetopens in 1 day

What opens next

The year on this river

JFMAMJJASOND

inside the window inside the peak. The outlined column is Sep.

More on the Vermilion River

Nearby run rivers

The rest of the run

Open the lake-run map →Every run river, with where the fish are holding today.Or get BirdTrout on the App Store