The colour is this river's run stage today, read off WDNR
run-timing guidance. Where along the corridor the fish are is not
modelled here — only the sixteen rivers the staging estimator covers
carry that.
Drawn 19 November 2026, north up, and it is a map of the river rather
than of the lake it runs from.
First runners · Steelheadas of 19 November 2026
The Cranberry River is running now. As of 19 November 2026 the loudest claim on it is lake-run brown trout at tail-off, 11 days left in the window — lake-run brown trout 1 September to 30 November and steelhead 1 September to 31 May 2027. The peaks: lake-run brown trout 1 October – 31 October, steelhead 1 April 2027 – 31 May 2027 and coho salmon 1 September 2027 – 30 September 2027. Coho salmon opens 1 September 2027, 286 days out. Windows are calendar guidance curated from WDNR run-timing prose and are month-grained, so the edges are the month rather than the day.
8.8 corridor miles · Lake Superior · windows curated from WDNR guidance ·
page built 19 November 2026
Every run window on the Cranberry River, in date order
The window is WDNR's curated run-timing guidance placed on this year's calendar. The
stage beside it is this site's reading of that window against 19 November 2026 and nothing more —
it is arithmetic on a date, not an observation of the river.