Tail-off · Lake-run brown trout as of 19 November 2026
The St. Louis River is running now. As of 19 November 2026 the loudest claim on it is lake-run brown trout at tail-off, 11 days left in the window — lake-run brown trout 1 September to 30 November. The peaks: lake-run brown trout 1 October – 31 October, steelhead 1 April 2027 – 31 May 2027, lake sturgeon 1 May 2027 – 30 June 2027 and pink salmon 1 September 2027 – 30 September 2027. Steelhead opens 1 March 2027, 102 days out. Windows are calendar guidance curated from Minnesota run-timing prose and are month-grained, so the edges are the month rather than the day.
16.5 corridor miles · Lake Superior · windows curated from Minnesota guidance · page built 19 November 2026
The window is Minnesota's curated run-timing guidance placed on this year's calendar. The stage beside it is this site's reading of that window against 19 November 2026 and nothing more — it is arithmetic on a date, not an observation of the river.
| Species | Window | Peak | Today |
|---|---|---|---|
| Lake-run brown trout | 1 September – 30 November Sept–Nov · calendar | 1 October – 31 October | Tail-off 11 days left in the window |
| Steelhead | 1 March 2027 – 31 May 2027 Mar–May · calendar | 1 April 2027 – 31 May 2027 | Not yetopens in 102 days |
| Lake sturgeon | 1 April 2027 – 30 June 2027 Apr–June · calendar | 1 May 2027 – 30 June 2027 | Not yetopens in 133 days |
| Pink salmon | 1 August 2027 – 30 September 2027 Aug–Sept · calendar | 1 September 2027 – 30 September 2027 | Not yetopens in 255 days |
| Chinook salmon | 1 September 2027 – 31 October 2027 Sept–Oct · calendar | 1 September 2027 – 30 September 2027 | Not yetopens in 286 days |
| Coho salmon | 1 September 2027 – 31 October 2027 Sept–Oct · calendar | 1 September 2027 – 31 October 2027 | Not yetopens in 286 days |
| Lake-run brook trout | 1 September 2027 – 31 October 2027 Sept–Oct · calendar | not stated | Not yetopens in 286 days |
inside the window inside the peak. The outlined column is Nov.